It pays if demand shows up.
A dedicated data center only pays off if AI compute demand materializes as anticipated. If that demand is late, or smaller than expected, the campus has little else earning against its cost.
ssi-d.com
Cheaper than a dedicated data center.
Solar carports over parking that is already in use, with EV chargers under the canopy running on the site's own solar. A micro data center on a retail floor that stays open. Many stores, one distributed AI data center.
Lower risk
If AI demand does not arrive on schedule, the solar and the battery still cut the store's power bill and still pay for themselves.
Read
The lift
No new building. Far simpler permitting: a solar carport permit instead of a new data center build. The grid connection can already handle the power.
Read
Part of Genmounts and REH Solar
ssi-d.com
01/Why now
For years, solar and battery backup at an individual retail site was hard to justify. The store saved on its power bill. That saving, by itself, was not a compelling project.
AI is why the return works now. Compute needs power, and a dedicated data center is difficult to build: land, a new building, a new interconnection, a long queue. A shopping center already has the building, a grid connection that can handle the power, and parking that is already full of cars. Add a micro data center and the same solar and battery are worth installing.
The project does not depend on selling power back to the utility. Export and net metering do not really pay, and they are not a profitable basis for the work. Excess solar and battery energy is used on site for EV charging and AI compute, and that use pays back far more.
The site only lowers its demand from the utility. It does not export, and it does not change the power agreement, so there is no new utility interconnection or power-agreement process. That approval is much simpler. The permit that is required is the far simpler one: a solar carport permit instead of a new data center build.
Repeat that across hundreds or thousands of stores and the sites become one distributed data center, powered by solar. The headline comparison: this model is cheaper than building a dedicated data center.
Compared
Dedicated data center
SSI-D
Dedicated
A new campus, financed as one project.
SSI-D
Lower. The distributed solar-retail model is cheaper than a dedicated data center.
Dedicated
A site to acquire.
SSI-D
Parking shoppers already use. The stalls stay in use under the carports.
Dedicated
A new data center building, and the heavy permitting that comes with it.
SSI-D
No new building. Far simpler permitting: a solar carport permit instead of a new data center build.
Dedicated
A new interconnection and a new power agreement, often a long queue.
SSI-D
No export, and no new power agreement. The site only lowers demand on the connection it already has. The permit is still a solar carport permit.
Dedicated
The whole campus.
SSI-D
The carport. Battery, EV chargers, and a compute cabinet go in with the store.
Dedicated
One concentrated site.
SSI-D
Hundreds or thousands of stores, operated as one distributed data center.
Dedicated
The campus pays off only if AI compute demand materializes as anticipated.
SSI-D
Solar and battery still cut the store's power bill, and still pay for themselves on a longer horizon.
Cheaper is one part of the case. Capacity also comes online faster, with less risk in every direction. And the energy asset still pays if compute demand is late.
02/Faster to deploy
SSI-D compute capacity comes online faster than a dedicated data center because it avoids the much heavier permitting and the local-government roadblocks of building a new one. The permitting is far simpler: a solar carport permit instead of a new data center build.
The work is essentially adding servers into existing racks, in businesses that are already open, on grid connections that are already there.
At the same time, the solar and the battery reduce the host store's grid power footprint and make its power more reliable. The site only lowers demand. It does not export, and it does not change the power agreement, so there is no new utility interconnection on top of the solar carport permit.
A smaller draw on the grid, and power that is more reliable, from solar and battery backup on site.
A solar carport permit on a lot that already exists, rather than the roadblocks of a new data center campus.
Capacity in businesses that are already open, on grid connections that are already there.
A simpler permit, a faster path than a new campus, and less risk in every direction.
Everybody wins. Much less risk in every direction.
03/Lower risk
The energy asset does not have to win the compute bet.
Dedicated data center
A dedicated data center only pays off if AI compute demand materializes as anticipated. If that demand is late, or smaller than expected, the campus has little else earning against its cost.
SSI-D site
Even if the AI and superintelligence side of the equation disappeared, the solar carports and the battery storage would remain. They would still cut the store's power costs. The asset would still pay for itself, on a longer time horizon.
The compute is the upside. The solar and the battery are the floor.
04/How it works
The center is already open, and it already has a grid connection that can handle the power. The site only lowers its demand from the utility. It does not export, and it does not change the power agreement, so there is no new utility interconnection or power-agreement process. There is no new building. Permitting is far simpler: a solar carport permit instead of a new data center build. The construction lift is the carport. Battery storage, EV chargers, and a compute cabinet install with it. Excess solar and battery energy stays on site for charging and compute, which pays back far more than export.
01
Carports go over parking that is already in use. Shoppers keep the stalls. The canopy shades the cars. Generation stays on site for the store, the chargers, and the compute, so the retailer saves on its power bill. The project does not depend on selling that power back to the utility.
02
ELM-type battery storage firms the solar and carries the site. It is backup for the store, and a steadier supply for the chargers and the compute.
03
A micro data center sits on the active retail floor, in a store that keeps trading. The cabinet is a Lektra EdgeStart: a self-contained 8-GPU NVIDIA server with UPS, PDU, firewall, and switch, running on the building's solar and batteries.
04
Each site includes chargers under the solar carports. With the microgrid — the site's solar and battery — vehicles charge on local solar energy, at free or very low cost, from the site's own local solar plant. Charging draws customers into the businesses and adds a revenue stream that helps the installation pay for itself.
Site plan · one shopping center
Already open
Solar carport overhead
In use
EV charger
In use
EV charger
Stalls stay occupied. The canopy shades the cars and is tied into the store. Chargers under the carport run on the site's own solar.
Tied into store power
Active retail floor
Retail space that is already open. No new building.
Micro data center
8-GPU NVIDIA cabinet. UPS, PDU, firewall, switch. Runs on the building's solar and batteries.
Battery
ELM-type storage. Backup and firming.
Existing grid
The connection that already serves the store, and can handle the power.
To the network
This site connects out. It is one address in a distributed data center.
Hundreds or thousands of stores. One distributed data center.
The distributed network
Each site connects to the internet and runs on the solar and the battery at that store. Together, the stores are one distributed AI data center: many addresses, one pool of compute, in place of a single concentrated campus.
05/Technology
That is the compute inside the store. The carports, the battery, and the chargers are the rest of the site.
Lektra lektra.com
06/For owners and retailers
The lot stays a parking lot. The store stays a store. The new work is a carport, storage, chargers, and a cabinet — on a building and a grid connection that are already there.
Solar is used on site and tied into the retail service. The store saves on the power it already buys. Excess energy goes to EV charging and the compute, not back to the utility.
Carports cover stalls that stay in use. Customers park in the shade.
Chargers sit under the canopies. Vehicles charge on the site's own solar, at free or very low cost, from the site's own local solar plant. That draws customers into the businesses, and the charging revenue helps the installation pay for itself.
Lektra Cloud sells the GPU capacity and pays the energy host a revenue share. The store keeps trading.
The battery carries the store when the grid stumbles, and firms the solar for the chargers and the cabinet.
No new building. Far simpler permitting: a solar carport permit instead of a new data center build. The construction is the carport — a much easier lift than a data-center campus.
For the neighborhood
Shaded parking, clean energy, local backup, and charging from solar generated on the lot. The community impact is local and visible, without the opposition that follows a large data center.
07/For compute customers
The distributed solar-retail model costs less than a dedicated data center.
The center keeps the grid connection it already has. The site lowers demand and does not export or change the power agreement, so there is no new utility interconnection. The permit is the simpler one: a solar carport, not a new data center build.
Compute runs on the building's solar and batteries. The cabinet is a Lektra EdgeStart — 8 NVIDIA GPUs, with UPS, PDU, firewall, and switch. Penguin Solutions deploys the NVIDIA hardware.
Sites sit in shopping centers people already visit, which keeps latency lower than a distant campus.
Each site connects to the internet. Together they are one distributed AI data center. Lektra Cloud sells the GPU capacity.
08/The group
Genmounts
REH Solar
SSI-D is part of Genmounts and REH Solar. Genmounts and REH Solar are how this group builds solar. SSI-D is the model that places that solar over parking already in use, ties it into the store, and adds battery storage, EV charging, and a micro data center — so the sites can run as one distributed AI data center.
09/Inquire
If you own or operate retail property, start with the site: the lot, the store, the service. If you need GPU capacity, start with the workload.